FR
OUR
FACILITIES
G3 Trois-Rivières
About Us TARIFFS News

About G3 Trois-Rivières

Licensed capacity: 109,000 T 
Rail access: CN, CP
Load berth draft (at chart datum): 10.7 m
Unload berth draft: 10.4 m
Load rate (average): Vessels: 1,500 T/hr
Maximum LOA: 2​28.0 m*
Maximum beam: ​32.0 m
*Can be longer if approved by Harbour Master.

Hours of operation:
8:00 a.m. to 4:00 p.m.

 

Contact Us

Telephone:
Phone: ​​819 374 6203
Fax: ​819 374 6392

Mailing address:
G3 Trois-Rivières
2615, Notre-Dame Centre
Trois-Rivières, QC
G9A 4Y7

Log-in to G3Services.ca

Find Us

 

G3 Trois-Rivières Tariffs

The following link provides information on G3 Trois-Rivières tariffs:
Download PDF

G3 Hamilton celebrates its grand opening

G3 Hamilton celebrates its grand opening

G3 Canada Limited’s staff and customers, as well as other dignitaries gathered today to celebrate the grand opening of G3’s new lake terminal at the Port of Hamilton.

June 22, 2017 Read More

G3 Canada Limited expands origination footprint in Saskatchewan

G3 Canada Limited expands origination footprint in Saskatchewan

G3 to begin construction of new primary elevators near Melville and Saskatoon

March 28, 2017 Read More

G3 Canada Limited Announces Construction of New Grain Terminal

G3 Canada Limited Announces Construction of New Grain Terminal

G3 Canada Limited (G3), a newly formed Canadian agribusiness, announced today that it will construct a new lake terminal at the Port of Hamilton to originate grains and oilseeds out of Southern Ontario for export to global markets.

October 13, 2015 Read More