FR
OUR
FACILITIES
G3 Québec
About Us TARIFFS News

About G3 Québec

Licensed capacity: 224,030 T 
Rail access: CN, CP
Load berth draft (at chart datum): 11.90 m*
Unload berth draft: 10.3 m
Load rate (average): Vessels: 3,000 T/hr
Maximum LOA: 235.0 m**
Maximum beam: 40.0 m***
* Tide levels at the Port Of Quebec allow for large vessels to complete on the rising tide to drafts of 15.0 m.
** LOA more than 225 m may require the vessel to shift at berth.
***Beam greater than 40 m may require the vessel to shift at the berth as maximum reach of the loading pipes is 40 m.

Hours of operation:
8:00 a.m. to 4:00 p.m.

 

Contact Us

Telephone:
Phone: ​​418​ 692​ 3761
Fax: ​418​ 692​ 0182

Mailing address:
G3 Québec
300, rue Dalhousie
Québec, QC
G1K 8M8 

Find Us

 

G3 Québec Tariffs

The following link provides information on G3 Québec tariffs:
Download PDF

G3 Canada Ltd to expand into Alberta, continue growth in Saskatchewan

G3 Canada Ltd to expand into Alberta, continue growth in Saskatchewan

G3 Canada Limited (G3) announced plans today to build two new facilities including its first primary elevator in Alberta, and further expand its grain origination network in Saskatchewan

March 20, 2018 Read More

G3 Hamilton celebrates its grand opening

G3 Hamilton celebrates its grand opening

G3 Canada Limited’s staff and customers, as well as other dignitaries gathered today to celebrate the grand opening of G3’s new lake terminal at the Port of Hamilton.

June 22, 2017 Read More

G3 Canada Limited expands origination footprint in Saskatchewan

G3 Canada Limited expands origination footprint in Saskatchewan

G3 to begin construction of new primary elevators near Melville and Saskatoon

March 28, 2017 Read More

G3 to build next-generation grain export terminal at the Port of Vancouver, BC

G3 to build next-generation grain export terminal at the Port of Vancouver, BC

WINNIPEG, December 21, 2016 (CNW) – G3 Terminal Vancouver, an affiliate of G3 Global Holdings (G3), is pleased to announce that it will build a state-of-the-art grain export terminal in North Vancouver, British Columbia, the first new grain terminal constructed at the Port of Vancouver since the 1960s.

December 21, 2016 Read More

G3 celebrates grand opening of Glenlea facility

G3 celebrates grand opening of Glenlea facility

G3 Canada Limited today celebrated the grand opening of G3 Glenlea, a high efficiency primary elevator in Glenlea, Manitoba.

October 5, 2016 Read More